Between the Star and the Saeco (mainly the Saeco). I know the Star is tops and that it'll lube/size 1000 boolits in an hour or two. What is a realistic production rate for the Saeco? Also, is the Saeco a nose-first or base-first design?
One more: Does the Star tend to leak lube when running boolits through that aren't at least .001 over the diameter being sized to?