BT Sniper
03-19-2021, 11:17 PM
59829, 30 cal BT, BTS 6.5, 2x LCC PRESS, Shipped 3/19/21
83607, Lee AES 22 cal set minus PF, Shipped 3/2021
48422, 500CS, (.4995") org. 12/7/20 Shipped 4/9/21
99403, BTS 40, RCBS, org. 3/22/21 Shipped 4/23/21
30721, 40, UX, BTX, RCBS AES, org. 10/1/20 Shipped 4/23/21
96001, 22 cal mold, 70 grain cores, org. 12/9/20 SHIPPED 5/14/21
V2B 6P9, mold, org. 12/9/20 SHIPPED 5/14/21
98204, 11 cav mold 22 cal 46 grains, org. 12/28/20 SHIPPED 5/14/21
12935, 22 cal eleven cavity mold @ 65 grains, org 2/5/21 SHIPPED 5/14/21
98684, 11 cavity mold, 60 grain, 22 cal, org. 3/22/21 SHIPPED 5/14/21
12586, BTX, org. 12/14/20 Shipped 5/27/21
19054, 22 cal Mold and CB, rcbs, org. 12/15/20 Shipped 5/27/21
16 shipments sent 5/25/21 (molds)
39576 btx Shipped 8/20/21
B.K. BTX Shipped 8/20/21
19025, BT40, BTX, AES, RCBS, org. 12/28/20 Shipped 8/23/21
85718, BTS 40, BTX, RCBS org. 4/20/21 Shipped 8/23/21
48075, BTS 40 PF,CS&CB, BTX, LCC AES, & 30CB org. 5/15/20 MOLD SHIPPED 1/28/21 Shipped 8/23/21
80701, 25 cal copper tubing insert and base punch, org. 3/25/20 Shipped 8/25/21
74601, 22 BTS, LCC PRESS, org. 10/7/20 Shipped 9/10/21
74601, 40 BTS, BTX, LCC, org. 12/15/20 Shipped 9/10/21
83607, 22 PF, lcc, org. 3/26/21 Shipped 9/10/21
87015, 22 cal, LCC PRESS, org. 7/10/20 Shipped 9/10/21
87015, 40 BTX, org 8/10/21 Shipped 9/10/21
33904, 22, LCC, org. 12/8/20 Shipped 9/10/21
85331, 22 flat base set, LEE PRESS org. 12/22/20 Shipped 9/15/21
52251, 22 flat base set, LCC, org. 9/1/20 Shipped 9/15/21
80817, 22 flat base set, LEE PRESS, org. 2/22/21 Shipped 9/15/21
53585, 22 cal, LEE PRESS, org. 3/24/21 Shipped 9/15/21
60160, 22 flat base set, rcbs, org. 12/11/20 Shipped 9/16/21
95051, 22 cal, RCBS, org. 8/5/21 Ready to ship 9/13/21, Shipped 11/8/21
38930, 30BT, RCBS, org. 1/19/21 30 CAL MOLD & AES SHIPPED 5/27/21 Completed & Shipped 11/10/21
67016, 6mm SMK, BT, hines tac, LCC, org. 4/15/20 No mold ordered Shipped 12/2/2021
30721, 9mm, rcbs, org. 10/1/20 shipped 12/3/21
83607, Lee AES 22 cal set minus PF, Shipped 3/2021
48422, 500CS, (.4995") org. 12/7/20 Shipped 4/9/21
99403, BTS 40, RCBS, org. 3/22/21 Shipped 4/23/21
30721, 40, UX, BTX, RCBS AES, org. 10/1/20 Shipped 4/23/21
96001, 22 cal mold, 70 grain cores, org. 12/9/20 SHIPPED 5/14/21
V2B 6P9, mold, org. 12/9/20 SHIPPED 5/14/21
98204, 11 cav mold 22 cal 46 grains, org. 12/28/20 SHIPPED 5/14/21
12935, 22 cal eleven cavity mold @ 65 grains, org 2/5/21 SHIPPED 5/14/21
98684, 11 cavity mold, 60 grain, 22 cal, org. 3/22/21 SHIPPED 5/14/21
12586, BTX, org. 12/14/20 Shipped 5/27/21
19054, 22 cal Mold and CB, rcbs, org. 12/15/20 Shipped 5/27/21
16 shipments sent 5/25/21 (molds)
39576 btx Shipped 8/20/21
B.K. BTX Shipped 8/20/21
19025, BT40, BTX, AES, RCBS, org. 12/28/20 Shipped 8/23/21
85718, BTS 40, BTX, RCBS org. 4/20/21 Shipped 8/23/21
48075, BTS 40 PF,CS&CB, BTX, LCC AES, & 30CB org. 5/15/20 MOLD SHIPPED 1/28/21 Shipped 8/23/21
80701, 25 cal copper tubing insert and base punch, org. 3/25/20 Shipped 8/25/21
74601, 22 BTS, LCC PRESS, org. 10/7/20 Shipped 9/10/21
74601, 40 BTS, BTX, LCC, org. 12/15/20 Shipped 9/10/21
83607, 22 PF, lcc, org. 3/26/21 Shipped 9/10/21
87015, 22 cal, LCC PRESS, org. 7/10/20 Shipped 9/10/21
87015, 40 BTX, org 8/10/21 Shipped 9/10/21
33904, 22, LCC, org. 12/8/20 Shipped 9/10/21
85331, 22 flat base set, LEE PRESS org. 12/22/20 Shipped 9/15/21
52251, 22 flat base set, LCC, org. 9/1/20 Shipped 9/15/21
80817, 22 flat base set, LEE PRESS, org. 2/22/21 Shipped 9/15/21
53585, 22 cal, LEE PRESS, org. 3/24/21 Shipped 9/15/21
60160, 22 flat base set, rcbs, org. 12/11/20 Shipped 9/16/21
95051, 22 cal, RCBS, org. 8/5/21 Ready to ship 9/13/21, Shipped 11/8/21
38930, 30BT, RCBS, org. 1/19/21 30 CAL MOLD & AES SHIPPED 5/27/21 Completed & Shipped 11/10/21
67016, 6mm SMK, BT, hines tac, LCC, org. 4/15/20 No mold ordered Shipped 12/2/2021
30721, 9mm, rcbs, org. 10/1/20 shipped 12/3/21