Lee PrecisionMidSouth Shooters SupplyRepackboxSnyders Jerky
Inline FabricationWidenersTitan ReloadingReloading Everything
RotoMetals2 Load Data
Results 1 to 16 of 16

Thread: work in progress - Pro Melt 2 PID upgrades

  1. #1
    ADMIN



    HATCH's Avatar
    Join Date
    Sep 2008
    Location
    Lexington, SC
    Posts
    6,706

    work in progress - Pro Melt 2 PID upgrades

    Click image for larger version. 

Name:	pm2-3.jpg 
Views:	15 
Size:	35.4 KB 
ID:	273071
    Click image for larger version. 

Name:	pm2-5.jpg 
Views:	26 
Size:	41.9 KB 
ID:	273072

    work in progress
    Don't like being hammered by the Cast Boolits Staff, then don't be a nail.
    The rules are simple to follow.

  2. #2
    ADMIN



    HATCH's Avatar
    Join Date
    Sep 2008
    Location
    Lexington, SC
    Posts
    6,706
    get me a picture of the rear of the unit were the fan is.
    Don't like being hammered by the Cast Boolits Staff, then don't be a nail.
    The rules are simple to follow.

  3. #3
    Boolit Master
    Gunslinger1911's Avatar
    Join Date
    Dec 2009
    Location
    Central Ohio
    Posts
    1,040
    Will do, I'll get more light in there too
    Cogno, Ergo, Boom

    If you're gonna be stupid, don't pull up short. Saddle up and ride it all the way in.

  4. #4
    Boolit Master
    Gunslinger1911's Avatar
    Join Date
    Dec 2009
    Location
    Central Ohio
    Posts
    1,040
    Wow, RCBS really doesn't want ya digging in there - what a pain ! But I'm up for it !!!

    Pics upcoming.

    Now I gotta drill out some more rivets to get to the probe - that has to move ! Preferably to into the melt.

    By the way what do you think of the cheepie "PID's" on Amazon ? Looking for a controller for the PC oven - tired of being a human PID. haha
    Cogno, Ergo, Boom

    If you're gonna be stupid, don't pull up short. Saddle up and ride it all the way in.

  5. #5
    Boolit Master
    Gunslinger1911's Avatar
    Join Date
    Dec 2009
    Location
    Central Ohio
    Posts
    1,040
    Ok, here we go !
    Click image for larger version. 

Name:	pm2-6.jpg 
Views:	30 
Size:	37.2 KB 
ID:	273099Click image for larger version. 

Name:	pm2-7.jpg 
Views:	27 
Size:	31.5 KB 
ID:	273100Click image for larger version. 

Name:	pm2-9.jpg 
Views:	28 
Size:	31.7 KB 
ID:	273101Click image for larger version. 

Name:	pm2-91.jpg 
Views:	29 
Size:	40.1 KB 
ID:	273102Click image for larger version. 

Name:	pm2-92.jpg 
Views:	28 
Size:	32.5 KB 
ID:	273103Click image for larger version. 

Name:	pm2-93.jpg 
Views:	27 
Size:	36.6 KB 
ID:	273104Click image for larger version. 

Name:	pm2-95.jpg 
Views:	26 
Size:	32.0 KB 
ID:	273105
    Cogno, Ergo, Boom

    If you're gonna be stupid, don't pull up short. Saddle up and ride it all the way in.

  6. #6
    Boolit Master
    Gunslinger1911's Avatar
    Join Date
    Dec 2009
    Location
    Central Ohio
    Posts
    1,040
    The "black box" in the last pic is the dealie that was zip tied to the PID. No markings what so ever on it.

    Third from last pic shows RCBS tried to seal the tab that unlocks the PID from the housing, haha
    Last edited by Gunslinger1911; 12-12-2020 at 06:13 PM.
    Cogno, Ergo, Boom

    If you're gonna be stupid, don't pull up short. Saddle up and ride it all the way in.

  7. #7
    Boolit Master
    Gunslinger1911's Avatar
    Join Date
    Dec 2009
    Location
    Central Ohio
    Posts
    1,040
    Haha, I have NO electrical talent at all !! (chemist by trade- caster/reloader by hobby).
    Those little electrons jumping around all over the place give me the willies !!!
    I did put a new plug on an extension cord once though - so I have that going for me.

    I'll take more pix as I gut this critter more (you know, you may end up with this thing on your door step !

    Thanks for the link to the PID, ordered it. I'll be bugging you on how to wire it.
    Cogno, Ergo, Boom

    If you're gonna be stupid, don't pull up short. Saddle up and ride it all the way in.

  8. #8
    ADMIN



    HATCH's Avatar
    Join Date
    Sep 2008
    Location
    Lexington, SC
    Posts
    6,706
    The hookup should be about the same as what you took off.
    That company that you ordered the PID from is the same one I deal with.
    It’s a good device.
    Don't like being hammered by the Cast Boolits Staff, then don't be a nail.
    The rules are simple to follow.

  9. #9
    ADMIN



    HATCH's Avatar
    Join Date
    Sep 2008
    Location
    Lexington, SC
    Posts
    6,706
    Don’t remove anything else right now
    Don't like being hammered by the Cast Boolits Staff, then don't be a nail.
    The rules are simple to follow.

  10. #10
    Boolit Master
    Gunslinger1911's Avatar
    Join Date
    Dec 2009
    Location
    Central Ohio
    Posts
    1,040
    OK
    Do you think the new PID will compensate for the issue of the old PID reading 750 and the alloy still solid ?

    I was thinking maybe the probe actually in the melt ?
    Cogno, Ergo, Boom

    If you're gonna be stupid, don't pull up short. Saddle up and ride it all the way in.

  11. #11
    ADMIN



    HATCH's Avatar
    Join Date
    Sep 2008
    Location
    Lexington, SC
    Posts
    6,706
    Won’t know until we set it up.
    It doesn’t take long to tear that apart again if we have to.
    The unknown thing is what ‘type’ of thermocouple is installed?
    They have several different types.
    All are different letters.
    This has to do with the curve it reports the temperature.
    Example.
    One type may say 500f is 7.34
    Another type may say 500f is 10.28
    And another night say 500f is 3.45
    Does that make sense? Keep in mind these are just figures to show a example of the curve.
    Also the different types have ratings limits on the range of temps they can be used on.
    The type that most people use is ‘K’.
    Magma Engineering uses ‘J’
    The PID can be configured to accept a wide range of ‘types’

  12. #12
    Boolit Master
    Gunslinger1911's Avatar
    Join Date
    Dec 2009
    Location
    Central Ohio
    Posts
    1,040
    OK, thanks again ! This is great info !

    I'll hold off any more tear down until we get the new PID in and see what happens.

    Another thing; what would your thoughts be on having the PID outside the housing so I don't have to mess with the 2 hour cool down ?

    Once I'm comfortable with that PID, would getting another one work for my PC oven ? I guess I'd have to get a thermocouple also.

    Sorry for all the questions, science nerd !
    Cogno, Ergo, Boom

    If you're gonna be stupid, don't pull up short. Saddle up and ride it all the way in.

  13. #13
    ADMIN



    HATCH's Avatar
    Join Date
    Sep 2008
    Location
    Lexington, SC
    Posts
    6,706
    ok..
    This is the idea I have.
    It is easiest to replace the PID with the same size unit initially.
    This will eliminate the PID as a issue.
    If the unit works correctly after that then we can make some changes that will not cost you a pile of money but will extend the life on the unit.
    but lets make the machine work first.

    2 hr cooldown? never heard of that.
    Don't like being hammered by the Cast Boolits Staff, then don't be a nail.
    The rules are simple to follow.

  14. #14
    Boolit Master
    Gunslinger1911's Avatar
    Join Date
    Dec 2009
    Location
    Central Ohio
    Posts
    1,040
    Gotcha Sir !
    Have I said "Thanks !"

    Yea, the cooldown.
    RCBS says that you have to set the PID to "0" temp, and let it cool to less than 160 deg so the PID doesn't fry.

    I have been letting the pot level go down as I finish up a casting session, set temp to zero, add a bunch of ingots to help cool, have fan blowing on it.

    From owners manual -

    1. Depress SET button, display will begin to flash.
    2. Use “V” , “ V”, and “V ” buttons to set SV temperature to 0o F, this will turn off Pot heating.
    3. The fan will continue to run to cool unit.
    4. When unit cools down and PV display reads 160o F, unplug AC cord from unit to completely power down unit
    Cogno, Ergo, Boom

    If you're gonna be stupid, don't pull up short. Saddle up and ride it all the way in.

  15. #15
    ADMIN



    HATCH's Avatar
    Join Date
    Sep 2008
    Location
    Lexington, SC
    Posts
    6,706
    that is stupid.
    You could simply install a toggle switch between the PID and the SSR.
    Basically switch the switch and wait.
    No more changing temp
    Don't like being hammered by the Cast Boolits Staff, then don't be a nail.
    The rules are simple to follow.

  16. #16
    ADMIN



    HATCH's Avatar
    Join Date
    Sep 2008
    Location
    Lexington, SC
    Posts
    6,706
    or a delay on break relay for the fan so the fan runs 10 mins after the pot is unplugged.
    Don't like being hammered by the Cast Boolits Staff, then don't be a nail.
    The rules are simple to follow.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Abbreviations used in Reloading

BP Bronze Point IMR Improved Military Rifle PTD Pointed
BR Bench Rest M Magnum RN Round Nose
BT Boat Tail PL Power-Lokt SP Soft Point
C Compressed Charge PR Primer SPCL Soft Point "Core-Lokt"
HP Hollow Point PSPCL Pointed Soft Point "Core Lokt" C.O.L. Cartridge Overall Length
PSP Pointed Soft Point Spz Spitzer Point SBT Spitzer Boat Tail
LRN Lead Round Nose LWC Lead Wad Cutter LSWC Lead Semi Wad Cutter
GC Gas Check