2020 completed orders
66801, 308 and 30-30 point form die, LCC, org. 11/26/18, est. 12/15/19 Shipped 1/6/20
84067, 30 cal point form die, LCC org. 9/13/18 est. 12/15/19 Shipped 1/6/20
33073, BTS 30 PF, org. 12/31/19, est. 2/7/20 Shipped 1/6/20
57110, LCC PRESS, 6mm CS & mold, .310 PB, 7/26/19 est. 12/30/19 Shipped 1/13/20
85296, BTS 40, AES, RCBS, org. 12/26/19, est. 1/14/20 Shipped 1/17/20
28348, .458, Draw, BTX, AES, RCBS org. 2/13/19 est. 1/15/20 Shipped 1/17/20
2615, 358 truncated, RCBS, org. 9/4/19, est. 1/16/20 Shipped 1/17/20
01527, 22 PF BTS, LEE PRESS, draw die, org. 11/20/19, est. 1/17/20 Shipped 1/21/20
44720, BTS 22 PF, org. 12/18/19 est. 1/22/20 Shipped 1/21/20
21716 BTS 22 cal VLD CS and PF, LCC, org. 2/22/19, est. 1/25/20 Shipped 1/23/20
29335, 65 grain mold, org. 12/21/19 est. 2/5/20 Shipped 1/24/20
STP T0E 1N0, BTS 22 cal package LCC PRESS x2, org. 7/29/19 est. 1/30/20 Shipped 1/30/20
80211, 29335, 49319, 69021, 93551, 03229, Shipped 4/9/20
33073, SG AES, org. 2/27/20, est. 4/15/20 Shipped 4/17/20
83263, Shipped 4/17/20
21108, CDN MTRX, Shipped 4/21/20
20176, 5.7 expander Shipped 4/23/20
21237, 20176 Shipped 4/24/20
59829, Shipped 4/24/20
80537, 50 BMG decap Shipped 4/29/20
07981, BTX Shipped 4/29/20
91001, BTX Shipped 4/29/20
87544, BTS 44, CSP, org. 12/6/19 est. 3/25/20 Shipped 5/5/20
21716, 22 VLD PF, Shipped 5/5/20
43460, 40 BTS, expander die, RCBS, org. 3/24/20, est. 4/24/20 (PIF) Shipped 5/8/20
93551, 73130 Shipped 5/8/20
34208, BTS 44, RCBS, BTX, org. 4/3/20, est. 5/3/20 Shipped 5/14/20
21668, BTS 44, RCBS, BTX, org. 4/16/20, est. 5/3/20 Shipped 5/14/20
7140, 44 cal, .375, RCE, org. 2/25/20, est. 3/15/20 Shipped 5/15/20
57785, BTSimple, RCBS, Nitride derim upgrade, org. 11/19/19, est. 4/3/20Derim & Mold sent 1/16/20 complete & Shipped 5/19/20
23462, BTSimple, RCBS, Nitride derim upgrade, org 12/30/19, est. 4/10/20 Derim & Mold sent 1/16/20 complete & Shipped 5/19/20
67016, BTSimple, LCC PRESS, 11 cav mold, Nitride derim upgrade, org. 12/14/19 est 4/7/20 Press, Derim & Mold sent 1/16/20 complete & Shipped 5/19/20
98204, BTSimple, RCBS, Nitride derim upgrade, org. 12/31/19, est. 4/15/19 Derim & Mold sent 1/16/20 complete & Shipped 5/19/20
93245, BTSimple, RCBS, Nitride derim upgrade, org. 1/13/20, est. 4/17/20 Derim & Mold sent 1/16/20 complete & Shipped 5/19/20
60634, BTSimple, RCBS, org 12/30/19, est. 3/12/20 complete & Shipped 5/22/20
81416, BTX complete & Shipped 5/22/20
CDN, 2 AES RCBS (PIF) complete & Shipped 5/29/20
68154, BTSimple, LCC AES, 11 cav mold, org. 4/13/20, est. 5/15/20 (PIF) Shipped 6/15/20
DE23 6NY, 22 premium package, 69 grain, LCC. org. 12/15/19, est. 6/25/20 Shipped 6/16/20
57110, BTSimple, 11 cavity mold, BTX, LCC org. 11/13/19 est. 6/15/20 Shipped 6/16/20
DDriller, BTS 40, LCC (PIF) est. 6/30/20 Shipped 7/13/20
93551, 45 pf, .500 pf & cs, org. 7/8/20, est. 7/17/20 Shipped 7/20/20
68506, BTSimple, LCC, Nitride derim upgrade, 1" AES, RCE cutter org. 12/6/19, est. 4/5/20 Derim, Mold, AES, & cutter sent 1/16/20READY TO SHIP 6/4/20 Shipped 7/22/20
68506, 6.5mm 11s BTS, LCC PRESS, 22PF 9s, org. 4/15/20 est. 6/15/20 (PIF) READY TO SHIP 6/4/20Shipped 7/22/20
95822, BTS 22 package w/BT, RCBS, org. 9/21/19 est. 6/22/20 (PIF) Shipped 7/31/20
3119, .510 AK, BTX, RCBS, org. 4/16/20, est. 7/26/20 Shipped 9/4/20
97417, 45 cal BTS, UX, RCBS, org. 3/30/20, est. 7/15/20 Shipped 9/4/20
SE15 4EB, 45 BTS, LCC PRESS, Mold, BTX, org. 4/6/20, est. 7/20/20 Shipped 9/18/20
SE15 4EB, 9mm, Mold, Bleed die, org. 4/6/20, est. 7/20/20 Shipped 9/18/20
SE15 4EB 30 cal molds, core bleed die and base punch Shipped 9/18/20
32024, 11 cavity mold drop at 46 grains, LCC shell holder ram top use with AES, org. 9/1/20, est. 10/1/20 Shipped 9/18/20
45122, 357PF, RCBS org. 8/26/20, est. 8/31/20 Shipped 9/18/20
92562, BTS 45, UX & BTX, RCBS, org. 5/4/20 est. 7/22/20 Shipped 10/9/20
49230, BTX Shipped 11/6/20
61565, BTX & expander Shipped 11/6/20
98801, BMG deprime Shipped 11/10/20
TOE 1N0, 40, UX, BTX, LCC, org. 9/30/20, est. 10/15/20 Shipped 11/12/20
53959, BTS 22 cal, LCC PRESS, org. 4/3/20, est. 7/30/20 Shipped 12/1/20
98404, 9mm, AES, BTX, RCBS, org. 5/8/20 est. 7/30/20 Shipped 12/10/20