RotoMetals2Snyders JerkyMidSouth Shooters SupplyReloading Everything
Load DataTitan ReloadingLee PrecisionRepackbox
Inline Fabrication Wideners
Page 7 of 20 FirstFirst 1234567891011121314151617 ... LastLast
Results 121 to 140 of 395

Thread: New shop update

  1. #121
    Moderator Emeritus


    MrWolf's Avatar
    Join Date
    Apr 2013
    Location
    NE West Virginia
    Posts
    4,893
    Think you guys need to check out Farmers Only dating site. I can say best I've seen and met my current girlfriend there. Just sayin unless you guys like each other

  2. #122
    Boolit Grand Master

    Join Date
    Oct 2009
    Location
    England,Ar
    Posts
    7,693
    I think this thread has been

  3. #123
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Yep definitely got off track there. LOL

  4. #124
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Back on track I got the name and number of a Gentleman that moves equipment on the side lots of good reviews on him from friends and others. He has a trailer that should hold everything one trip including his lift truck, Maybe tomorrow get the chalk line out and doo some lay out work

  5. #125
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Today they put the last 3 pieces of siding and trim on building is done now. Called for the occupancy inspection late today.

  6. #126
    Boolit Grand Master

    Wayne Smith's Avatar
    Join Date
    Mar 2005
    Location
    Hampton Roads, Virginia
    Posts
    13,642
    Congratulations!
    Wayne the Shrink

    There is no 'right' that requires me to work for you or you to work for me!

  7. #127
    Boolit Grand Master

    Join Date
    Oct 2009
    Location
    England,Ar
    Posts
    7,693
    It sounds like you have a really nice shop. It came together rather smoothly too!
    Last edited by lightman; 07-26-2019 at 08:57 AM.

  8. #128
    Moderator Emeritus


    MrWolf's Avatar
    Join Date
    Apr 2013
    Location
    NE West Virginia
    Posts
    4,893
    Still waiting on some pics

  9. #129
    Boolit Master
    Mal Paso's Avatar
    Join Date
    Jun 2010
    Location
    Carmel, Ca
    Posts
    4,121
    Does that window on the left look a little crooked to you?
    Mal

    Mal Paso means Bad Pass, just so you know.

  10. #130
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Naw its just an optical illusion.

  11. #131
    Banned
    Join Date
    Feb 2016
    Posts
    2,725
    Yup, it's the way the light hits it ...

  12. #132
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Worked about 3 hours today sorting and organizing, slow going since I cant carry a lot in the chair. Got most of the first trailer done need to get a couple shelving units ordered and up now to keep moving forward. I trailer to go after this batch. Been looking at shelving units last couple days now. Then get the saws and make racks for tools and fishing poles. May hang a sheet or 2 of peg board for shovels rakes tile probes and things.

  13. #133
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Ordered 2 set of shelving today steel 70" H x 60" W X 18" D. grated shelving so dust and dirt don't sit on the shelves. Has 1000lb per shelf rating when evenly distributed. Also ordered 6 4' 3200 lumen led lights for the building area. The enclosed shop will need to be other light source. Its still coming along

  14. #134
    Banned
    Join Date
    Feb 2016
    Posts
    2,725
    Those pictures definitely do not do it justice.

  15. #135
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Am hoping to have some pocs of the outside of the building up soon. A friend is going to take them

  16. #136
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Got in 2 sets of shelving for in the actual building ( not the shop area / room) and 6 led lights 3100 lumens each. The shelving units are 70" H X 70" W and 18"D. shelves are rated for 1000 lbs. Son put one together yesterday for me went together quick and easy the only tool needed was the end of a hammer handle to tap the sides down in place. 5 shelves . Unit weighs 150 lbs. filled 3 shelves today. Im looking at 2 lights per bay in the building for now. building is 40' so 13' from back wall and 13' from front wall and can angle them if needed. Need to get some additional chain and screw hooks to install these yet. Got most of first trailer put away on the shelves today. with room to spare. Found a 2 lb lead hammer mould Id forgotten about. Its bigger than I normally use. But it can be a pattern for a smaller one.

  17. #137
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Went out to day and rough marked on the floor where the lights will be over head. That looks good and pretty good to start. I'm thinking angle the front lights towards the back and the back lights towards the front so they cross over to negate shadows. I assembled most of the second set of shelves by myself today. all but the very top grate shelf and very bottom shelf. I just couldn't get to them from the wheel chair LOL. Was a lot slower going for me than my son but I got er done. LOL. Hopefully tomorrow the occupancy certificate and I can start finishing up.

  18. #138
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    Still waiting on the occupation inspection to be done. The township is having issues and the busy body next door is involved Im caught up in the middle of it. Don't know when this will be settled. Until I get the certificate Im dead in the water and cant do anything more. What a pain

  19. #139
    Boolit Master
    1911sw45's Avatar
    Join Date
    Jun 2008
    Location
    Princeton, KY
    Posts
    516
    That’s bs.

  20. #140
    Boolit Grand Master

    Join Date
    Mar 2013
    Location
    Northwest Ohio
    Posts
    14,536
    More so than you think. When I gilled out the application I submitted a detailed to scale drawing of size location spacing from property lines road and from house. The application was approved and the building permit issued to put the building up. NOW all at once its a big issue. Im just sick over this. Its looking more and more like Im going to be in court over this

Page 7 of 20 FirstFirst 1234567891011121314151617 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Abbreviations used in Reloading

BP Bronze Point IMR Improved Military Rifle PTD Pointed
BR Bench Rest M Magnum RN Round Nose
BT Boat Tail PL Power-Lokt SP Soft Point
C Compressed Charge PR Primer SPCL Soft Point "Core-Lokt"
HP Hollow Point PSPCL Pointed Soft Point "Core Lokt" C.O.L. Cartridge Overall Length
PSP Pointed Soft Point Spz Spitzer Point SBT Spitzer Boat Tail
LRN Lead Round Nose LWC Lead Wad Cutter LSWC Lead Semi Wad Cutter
GC Gas Check