Any guess as to when production will begin...and...I have been looking back trying to find the drawing with the dimensions and can't find it. Could someone please direct me to it or PM me. Thanks
Any guess as to when production will begin...and...I have been looking back trying to find the drawing with the dimensions and can't find it. Could someone please direct me to it or PM me. Thanks
Je suis Charlie
ΔΕΞΑΙ
Rednecks run the Brits out of this country years ago,
I will defend this country from anyone or thing that tries to take it from me or mine
I AM A REDNECK!!!
"If ever a time should come, when vain and aspiring men shall possess the highest seats in Government,our country will stand in need of its experienced patriots to prevent its ruin." Samuel Adams, 1776
Hard to say when production will begin. Maybe Mihec fixes the closing time for when he orders material, or maybe not until production has already begun, or maybe around some other timeframe. That's really up to him and none of our concern.
If what you are really curious about is when deliveries can be expected, anywhere from 2 weeks to 10 months after the buy closes, with 4-8 weeks the most common. You can get an idea of the flow of typical buys, as well as get a feeling for the large degree of uncertainty, by looking at the traced history of recent past and current buys.
---------------------------------------------------------------------------
--BattleRife
BP | Bronze Point | IMR | Improved Military Rifle | PTD | Pointed |
BR | Bench Rest | M | Magnum | RN | Round Nose |
BT | Boat Tail | PL | Power-Lokt | SP | Soft Point |
C | Compressed Charge | PR | Primer | SPCL | Soft Point "Core-Lokt" |
HP | Hollow Point | PSPCL | Pointed Soft Point "Core Lokt" | C.O.L. | Cartridge Overall Length |
PSP | Pointed Soft Point | Spz | Spitzer Point | SBT | Spitzer Boat Tail |
LRN | Lead Round Nose | LWC | Lead Wad Cutter | LSWC | Lead Semi Wad Cutter |
GC | Gas Check |