First time smelting lead. I had lead purchased from scrape
Yard.
First up was a lead brick that came out OK 2nd pic.
Next was a lead boat anchor about 20 lbs . When I dumped from my mold it might have been a little early. When I came back and looked some had broken and they looked grainy.
They are a lot harder than the first ones.
What might I have done wrong.
I was keeping temp around 500 degrees.First batch I let get to 700 degrees.
Outside temp was running around 53 degrees.
3rd batch was lead flashing very soft they came out good.
Darrell