Snyders JerkyRepackboxLoad DataLee Precision
RotoMetals2Titan ReloadingInline FabricationWideners
MidSouth Shooters Supply Reloading Everything
Page 1 of 5 12345 LastLast
Results 1 to 20 of 97

Thread: Anyone wanna go in on 80 tons of lead? lol

  1. #1
    Boolit Bub
    Join Date
    Mar 2012
    Location
    North Carolina
    Posts
    42

    Anyone wanna go in on 80 tons of lead? lol

    http://www.govliquidation.com/auctio...&convertTo=USD

    I couldn't help myself, that's a lifetime supply right there

  2. #2
    Boolit Master
    Lefty SRH's Avatar
    Join Date
    May 2011
    Location
    Athens, AL
    Posts
    2,172
    For several people!

  3. #3
    Boolit Grand Master

    MBTcustom's Avatar
    Join Date
    Feb 2011
    Location
    Arkansas
    Posts
    6,994
    Opening bid is $150. If we got enough members together on this, we could hook up our folks for a very long time!
    Precision in the wrong place is only a placebo.

  4. #4
    Boolit Master
    Join Date
    Mar 2011
    Location
    Kalispell, Montana
    Posts
    1,468
    Group buy!

  5. #5
    Boolit Master
    Join Date
    Mar 2011
    Location
    Kalispell, Montana
    Posts
    1,468
    So, it says requires mutilation.
    How does one mutilate lead? Or do they mean changing it's shape? :takinWiz:

    I can mutilate lead at 195 grains at a time, but 158k pounds will take me awhile

  6. #6
    Boolit Grand Master

    MBTcustom's Avatar
    Join Date
    Feb 2011
    Location
    Arkansas
    Posts
    6,994
    It probably requires destroying/defacing any markings on the lead. We do this all the time at my day job.
    Precision in the wrong place is only a placebo.

  7. #7
    Boolit Bub
    Join Date
    Mar 2012
    Location
    North Carolina
    Posts
    42
    yeah the listing shows that mutilation on site or offsite by a certified DoD person,

    How much propane would be needed to cast 160,000 corn cob ingots?

    And is there anyone with a big enough truck?

  8. #8
    Boolit Master
    x101airborne's Avatar
    Join Date
    Sep 2010
    Location
    6 foot deep in trouble Victoria,Tx
    Posts
    2,754
    Wish I was still in North Bama. That would be a short trip and I knew a guy with 2 18 wheelers. It would have cost me two cases of beer and fuel.
    I came into this world kicking, screaming, and covered in someone elses blood. I plan to go out the same way.

  9. #9
    Boolit Buddy H.Callahan's Avatar
    Join Date
    Apr 2011
    Location
    East Central Illinois
    Posts
    470
    Quote Originally Posted by spuddicus View Post
    yeah the listing shows that mutilation on site or offsite by a certified DoD person.
    I think it has to be WITNESSED by a DoD person. The buyer gets to do the mutilation.

  10. #10
    Boolit Master
    Lefty SRH's Avatar
    Join Date
    May 2011
    Location
    Athens, AL
    Posts
    2,172
    Quote Originally Posted by x101airborne View Post
    Wish I was still in North Bama. That would be a short trip and I knew a guy with 2 18 wheelers. It would have cost me two cases of beer and fuel.
    I'm in north Alabama! I don't have too many connections though.

  11. #11
    Boolit Bub
    Join Date
    Mar 2012
    Location
    North Carolina
    Posts
    42
    Quote Originally Posted by H.Callahan View Post
    I think it has to be WITNESSED by a DoD person. The buyer gets to do the mutilation.

    Meant to type that

  12. #12
    Boolit Master
    Join Date
    Mar 2012
    Location
    ALASKA
    Posts
    876
    A fella would need one BIG smelting pot for that. I wonder if thats all more or less "pure" lead.....

  13. #13
    Boolit Master
    Join Date
    Mar 2009
    Posts
    1,625
    I think one needs to clarify what exactly will pass as "mutilation". Perhaps all one needs is a good sledge hammer. Maybe a chainsaw.

    If anyone ever really wanted to make a serious attempt at something like this I'd be down to help / participate.

  14. #14
    Boolit Master
    Join Date
    May 2012
    Location
    Close to da Creaux,Hang'n out in Swamp's and Bayou's
    Posts
    800
    Yeah...I'm in for a crate..61 left to go...

  15. #15
    Boolit Master

    Join Date
    Aug 2012
    Location
    North Carolina, USA
    Posts
    1,640
    I think you'd need four or five 18-wheelers to move that much -- and the auction states that mutilation has to take place (either on site, or at buyer's facility witnessed by DOD rep) before title transfers. I suspect the mutilation is to ensure the material isn't resold as is or transferred out of the country intact (the latter could potentially transfer classified information).

    I don't even know how you'd go about mutilating 79+ tons of lead in a manner that would disguise its prior form, short of melting it -- and I bet you'd have to re-crate it afterward to ship it. Like a lot of government "scrap" auctions, you'd spend much more moving it than it cost you to buy it...

  16. #16
    Boolit Master
    Join Date
    Jan 2011
    Location
    Nebraska
    Posts
    1,172
    How many flatbed trailer loads would 158,500 pounds be?

    Anybody have any insight?

    Okay, I was posting when the answer was given by I'll Make Mine.

    Fellas, if I were rich...

    ...I wouldn't be so for long...
    Last edited by bowfin; 10-04-2012 at 04:42 PM. Reason: Previous Post Answered Question

  17. #17
    Boolit Master

    Join Date
    Aug 2012
    Location
    North Carolina, USA
    Posts
    1,640
    Probably depends on state highway laws, but I seem to recall a limit of around 20 or so tons of payload in the box trailers that haul out of the warehouse I work in (I don't work with the trailers, so I could be off by a significant factor). The legal limitation is usually load per axle, which leads to some odd things sometimes (like concrete mixer trucks with six axles, three of which are hydraulically retractable for when they haven't got a full mixer).

  18. #18
    Banned

    Join Date
    Dec 2007
    Location
    soda springs Id.
    Posts
    28,088
    usually 16,000 per axle except in states that go by bridge weight.

  19. #19
    Boolit Master



    mac60's Avatar
    Join Date
    Nov 2010
    Location
    Alabama Gulf Coast
    Posts
    1,043
    20 tons is about right. Your gross wgt. can't exceed 80,000 lbs. 12k on the steering axle, 34k on the drive wheels and 34k on the trailer tandems. Trailers with axles spread 10 ft. apart can go up to 40k on the trailer tandems (that doesn't change the gross requirements of 80,000 - so if you went 40k on the trailer tandems, the difference of 6,000 would have to come off somewhere else, probably the drive wheels). Some carriers can get exemptions. If you're overweight going over the scales the fine you pay in effect becomes your overweight permit. I haul compressed gas cylinders and on my particular trailer (it's a 10 on 2 spread axle) my payload limit is 44,500 lbs. So you're probably looking at 4 loads (depending on how you load it - could be more than 4)
    So many guns, so little time
    _____________________________

    You must pay for everything in this life - nothing is free, except for the grace of God.

    "Free cheese only comes in a mousetrap"

  20. #20
    Boolit Master
    Join Date
    Aug 2009
    Location
    gardners pa.
    Posts
    3,443
    i would be interested in some a ton or 2.

Page 1 of 5 12345 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Abbreviations used in Reloading

BP Bronze Point IMR Improved Military Rifle PTD Pointed
BR Bench Rest M Magnum RN Round Nose
BT Boat Tail PL Power-Lokt SP Soft Point
C Compressed Charge PR Primer SPCL Soft Point "Core-Lokt"
HP Hollow Point PSPCL Pointed Soft Point "Core Lokt" C.O.L. Cartridge Overall Length
PSP Pointed Soft Point Spz Spitzer Point SBT Spitzer Boat Tail
LRN Lead Round Nose LWC Lead Wad Cutter LSWC Lead Semi Wad Cutter
GC Gas Check