Think you guys need to check out Farmers Only dating site. I can say best I've seen and met my current girlfriend there. Just sayin unless you guys like each other:bigsmyl2:
Printable View
Think you guys need to check out Farmers Only dating site. I can say best I've seen and met my current girlfriend there. Just sayin unless you guys like each other:bigsmyl2:
I think this thread has been :hijack:
Yep definitely got off track there. LOL
Back on track I got the name and number of a Gentleman that moves equipment on the side lots of good reviews on him from friends and others. He has a trailer that should hold everything one trip including his lift truck, Maybe tomorrow get the chalk line out and doo some lay out work
Today they put the last 3 pieces of siding and trim on building is done now. Called for the occupancy inspection late today.
Congratulations!
It sounds like you have a really nice shop. It came together rather smoothly too!
Still waiting on some pics:bigsmyl2:
Does that window on the left look a little crooked to you?
Naw its just an optical illusion.
Yup, it's the way the light hits it ...
Worked about 3 hours today sorting and organizing, slow going since I cant carry a lot in the chair. Got most of the first trailer done need to get a couple shelving units ordered and up now to keep moving forward. I trailer to go after this batch. Been looking at shelving units last couple days now. Then get the saws and make racks for tools and fishing poles. May hang a sheet or 2 of peg board for shovels rakes tile probes and things.
Ordered 2 set of shelving today steel 70" H x 60" W X 18" D. grated shelving so dust and dirt don't sit on the shelves. Has 1000lb per shelf rating when evenly distributed. Also ordered 6 4' 3200 lumen led lights for the building area. The enclosed shop will need to be other light source. Its still coming along
Those pictures definitely do not do it justice.
:bigsmyl2:
Am hoping to have some pocs of the outside of the building up soon. A friend is going to take them
Got in 2 sets of shelving for in the actual building ( not the shop area / room) and 6 led lights 3100 lumens each. The shelving units are 70" H X 70" W and 18"D. shelves are rated for 1000 lbs. Son put one together yesterday for me went together quick and easy the only tool needed was the end of a hammer handle to tap the sides down in place. 5 shelves . Unit weighs 150 lbs. filled 3 shelves today. Im looking at 2 lights per bay in the building for now. building is 40' so 13' from back wall and 13' from front wall and can angle them if needed. Need to get some additional chain and screw hooks to install these yet. Got most of first trailer put away on the shelves today. with room to spare. Found a 2 lb lead hammer mould Id forgotten about. Its bigger than I normally use. But it can be a pattern for a smaller one.
Went out to day and rough marked on the floor where the lights will be over head. That looks good and pretty good to start. I'm thinking angle the front lights towards the back and the back lights towards the front so they cross over to negate shadows. I assembled most of the second set of shelves by myself today. all but the very top grate shelf and very bottom shelf. I just couldn't get to them from the wheel chair LOL. Was a lot slower going for me than my son but I got er done. LOL. Hopefully tomorrow the occupancy certificate and I can start finishing up.
Still waiting on the occupation inspection to be done. The township is having issues and the busy body next door is involved Im caught up in the middle of it. Don't know when this will be settled. Until I get the certificate Im dead in the water and cant do anything more. What a pain
That’s bs.
More so than you think. When I gilled out the application I submitted a detailed to scale drawing of size location spacing from property lines road and from house. The application was approved and the building permit issued to put the building up. NOW all at once its a big issue. Im just sick over this. Its looking more and more like Im going to be in court over this