country gent
Heard back from another Heating shop, they are recommending a "split" with a heat pump to handle both. Tomorrow were framing in the long wall of the building and possibly hanging some ceiling joists. Heard back from the electrician and thats a go.
I have the screws here now to hang the walls sheeting with so thats ready. I drew out and made the bill of materials for the ceiling mounted air manifold, then figured volumes it will add 9 1/2 gallons capacity to the compressors tank.
Im getting close to making chips.
The biggest jib is coming up once the room is done and shelves, cabinets and boxes are set in place. Organizing all the tooling where it can be found gotten at in a handy way. Chucks lathe and drill, collets collets chucks drawbars, vises, cutting tools, drills, reamers,mills, boring heads. I have 4 shelving units now 18 x 48 x 42" I bought 96" tall and assembled in 1/2 units. But will no doubt need more.